From the Master Project List, 2008 Version…the update. To be followed with an updated “2009 Version”.
Add sprit for cruising asymmetrical; on order from Hallberg-Rassy- Re-caulk teak deck; as much as I can do vs. a little as I can get away with
Replace damaged 24V AlternatorPaint the bottom, replace the zincsReplace the valves in the headsGot the forward one done anywayNew BiminiNew Cushions- Figure out why I the SSB barely works. It’s probably me, not the radio.
- Add a small electric bilge pump hard wired to 12V house
- Fix the oven control knob
- Fix the oil change and 2nd emergency bilge/fire pumps
- Repair/Replace the manual bilge pump
Get the Freedom 25 charger fixedSort of fixed it…Get the life raft re-certifiedOr totaled, cut up and thrown out.Add a couple of solar panelsSix on last year, two left- Move the propane tanks back to the propane locker, add a solenoid
- Add a salt water washdown to the anchor locker
Install Cabin Fans (6 24v fans)Got a couple of them inAdd a UV cover to the 105% jibRecondition/restore the gelcoat shinean ongoing battle, really- Clean all the rest of the crud out of the lockers, lazarettes, under floor compartments that I still haven’t gotten around to doing
Replace the heads…maybe just the aft toilet.
So some progress was made, but it’s never enough. Of course there are many NEW things to do. That list is forthcoming.
Two steps forward, one step back.
2 Comments
B.J.
Your lists resembles mine in a lot of ways. Since your boat is larger and more complex, well, your items are larger and more complex.
These lists never go away! I completed another item today, but added two.
And I haven’t even gotten around to adding the new stuff for 2009…that is just what I failed to accomplish last year.
It never ends.