- Add sprit for cruising asymmetrical; on order from Hallberg-Rassy
- Re-caulk teak deck; as much as I can do vs. a little as I can get away with
- Replace damaged 24V Alternator
- Paint the bottom, replace the zincs
- Replace cables on davits; rebuilt the squeaky davit
- Replace the valves in the heads (easier to get new valves from H-R than re-plumb)
- New Bimini
- New Cushions
- Figure out why I the SSB barely works. It’s probably me, not the radio.
- Add a small electric bilge pump hard wired to 12V house
- Fix the oven control knob
- Fix the oil change and 2nd emergency bilge/fire pumps
- Repair/Replace the manual bilge pump
- Get the Freedom 25 charger fixed
- Get the life raft re-certified
- Add a couple of solar panels
- Move the propane tanks back to the propane locker, add a solenoid
- Add a salt water washdown to the anchor locker
- Install Cabin Fans (6 24v fans)
- Add a UV cover to the 105% jib
- Recondition/restore the gelcoat shine
- Clean all the rest of the crud out of the lockers, lazarettes, under floor compartments that I still haven’t gotten around to doing
- Replace the heads…maybe just the aft toilet.