The Master Project List – 2008 Version

As mentioned, here is the master list for Winter 07/Spring 08. All of this is supposed to be done…by May? Ha.

I see the source for many updates here as I beat myself senseless trying to get all of this done.

  • Add sprit for cruising asymmetrical; on order from Hallberg-Rassy
  • Re-caulk teak deck; as much as I can do vs. a little as I can get away with
  • Replace damaged 24V Alternator
  • Paint the bottom, replace the zincs
  • Replace cables on davits; rebuilt the squeaky davit
  • Replace the valves in the heads (easier to get new valves from H-R than re-plumb)
  • New Bimini
  • New Cushions
  • Figure out why I the SSB barely works. It’s probably me, not the radio.
  • Add a small electric bilge pump hard wired to 12V house
  • Fix the oven control knob
  • Fix the oil change and 2nd emergency bilge/fire pumps
  • Repair/Replace the manual bilge pump
  • Get the Freedom 25 charger fixed
  • Get the life raft re-certified
  • Add a couple of solar panels
  • Move the propane tanks back to the propane locker, add a solenoid
  • Add a salt water washdown to the anchor locker
  • Install Cabin Fans (6 24v fans)
  • Add a UV cover to the 105% jib
  • Recondition/restore the gelcoat shine
  • Clean all the rest of the crud out of the lockers, lazarettes, under floor compartments that I still haven’t gotten around to doing
  • Replace the heads…maybe just the aft toilet.

I think that’s about all of it. I’m not doing all of it myself thankfully.

Related Posts Plugin for WordPress, Blogger...
This entry was posted in projects. Bookmark the permalink. Follow any comments here with the RSS feed for this post. Both comments and trackbacks are currently closed.

Comments are closed.